Svoboda | Graniru | BBC Russia | Golosameriki | Facebook

Tutorial Videos

Browse all our videos by category

Last seen

7:03
How to work 2-coloured English rib with second colour in the edge and colour change

In this DROPS video we show how to work 2-colour English rib in stripes where it works with the second colour on the edge stitches/band stitches and how to twist the strands together when changing colours. The edge stitches/band stitches works in garter stitches. ROW 1 (from RS): Work 5 edge stitches in garter stitch with the second colour, switch to the main colour, but twist the strands together to avoid holes and work English rib to the edge stitches on the other side. Lift the edge stitches over to the right needle, push the stitches back on the circular needle so the next row is also worked from the right side. ROW 2 (from RS): Lift the edge stitches over to the right needle, work English rib with the second colour and work 5 edge stitches in garter stitch, turn. ROW 3 (from WS): Work 5 edge stitches in garter stitch with the second colour, change to the main color, remember to twist the strands to avoid holes and work English rib to the edge stitches on the other side, lift the edge stitches over to the right needle. Push the stitches back on the circular needle so the next row is also worked from the wrong side. ROW 4 (from WS): Lift the edge stitches over to the right needle, work English rib with the second colour and work 5 edge stitches in garter stitch, turn. Repeat row 1- 4. We use the yarn DROPS Air in the video. You must also read a pattern using this technique as well as watch the video. You can find a pattern using this technique by clicking one the picture below.

12:49
How to work the jacket in DROPS 248-5 – Part 3

In this DROPS video we show a bit of how the Sand Diamond Cardigan is worked. We use the stitch numbers for size M. We have already worked the bands with an I-cord edge, some of chart A.1, A.2, A.3 and A.4 (see video Part 1) and worked YOKE until the part divide for body and sleeves. (see video Part 2). We start the video by working the row where we divide the bodies and sleeves (from right side). Read under DIVIDE FOR BODY AND SLEEVES – ALL SIZES in the pattern. In size M there should then be 235 stitches for the body and 56 stitches for each sleeve. Then it is working from wrong side and work 2nd row in the charts as follows: Work 7 band stitches as before, A.6, A.3 until there are 12 stitches left, A.5 and 7 band stitches as before. * Work 7 band stitches as before, A.5, A.3 until there are 13 stitches left, A.6 and 7 band stitches as before. Work the diagrams 1 time in height. Continue with 7 band stitches as before, A.7, A.3 until there are 18 stitches left, A.8 and 7 band stitches as before. Work the diagrams 1 time in height *. Work from *-* until the body have the specified length (18 cm in size M), finishing after a complete repeat of A.3 in height. Remember the buttonholes. Then change the needle, work a rib, increase stitches and work the 7 band stitches on each side are worked as before, read more in the pattern. This jacket is worked in DROPS Daisy, but in the video, we use DROPS Cotton Merino color no. 30. You must read the pattern and look at the charts to be able to follow this video properly. You’ll find the pattern by clicking on the picture below. You will also find several tutorials videos for this jacket, see below.