Svoboda | Graniru | BBC Russia | Golosameriki | Facebook
PMC full text:

Table 2

Results of data simulation showing unbiased estimate from two-stage least-squares regression in the presence of confounding.

ModelBeta (95% CI)a
Y on X (linear regression)0.26 (0.25, 0.28)
Y on X (two stage least squares)−0.29 (−0.37, −0.21)
aTrue value of beta from simulation is −0.3.