Svoboda | Graniru | BBC Russia | Golosameriki | Facebook

To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Khersan-3 Dam
Location of Khersan-3 Dam in Iran
CountryIran
LocationAtashgah, Chaharmahal and Bakhtiari Province
Coordinates31°14′52.51″N 50°58′34.79″E / 31.2479194°N 50.9763306°E / 31.2479194; 50.9763306
PurposePower, flood control, regulation
StatusUnder construction
Construction began2007
Opening date2015
Owner(s)Iran Water and Power Resources Development Co.
Dam and spillways
Type of damArch, double-curvature
ImpoundsKhersan River
Height195 m (640 ft)
Length470 m (1,542 ft)
Width (crest)6 m (20 ft)
Width (base)40 m (131 ft)
Dam volume1,100,000 m3 (1,438,746 cu yd)
Spillway typeControlled
Spillway capacity6,300 m3/s (220,000 cu ft/s)
Reservoir
CreatesKhersan-3 Reservoir
Total capacity1,158,400,000 m3 (939,130 acre⋅ft)
Catchment area7,733 km2 (2,986 sq mi)
Surface area24.5 km2 (9 sq mi)
Maximum length40 km (25 mi)
Maximum width400 m (1,312 ft) (average)
Normal elevation1,432 m (4,698 ft)
Power Station
Commission date2015
Hydraulic head177 m (581 ft) (design)
Turbines4 x 100 MW Francis-type
Installed capacity400 MW
Annual generation1121 GWh [1]

Khersan-3 dam is a hydroelectric arch dam currently under construction on the Khersan River, a tributary of the Karun River, in Iran. When complete it will have an installed capacity of 400 MW. It is situated near Atashgah in Chaharmahal and Bakhtiari Province and is a complementary dam to Khersan project along with the proposed Khersan-1 and Khersan-2 dams. Construction began in 2007 and it is expected to become operational in 2015.[2]

See also

References

  1. ^ "Khersan 3 Technical Information". Iran Water and Power Resources Development Co. Archived from the original on 9 May 2015. Retrieved 6 June 2013.
  2. ^ "Khersan-3 Project Information". Iran Water and Power Resources Development Co. Archived from the original on 14 July 2013. Retrieved 6 June 2013.


This page was last edited on 24 June 2024, at 08:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.