Svoboda | Graniru | BBC Russia | Golosameriki | Facebook

To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Pak Mun Dam
Main wall of the Pak Mun Dam
Location of Pak Mun Dam in Thailand
CountryThailand
LocationKhong Chiam District, Ubon Ratchathani Province
Coordinates15°16′55″N 105°28′6″E / 15.28194°N 105.46833°E / 15.28194; 105.46833
Construction began1990
Opening date1994
Construction costUS$240 million
Dam and spillways
ImpoundsMun River
Height17 m (56 ft)
Length300 m (984 ft)
Width (crest)7.5 m (25 ft)
Reservoir
CreatesPak Mun Reservoir
Power Station
Operator(s)Electricity Generating Authority of Thailand
Commission date1994
Turbines4
Installed capacity136 MW
Annual generation290 GWh

The Pak Mun Dam (Thai: เขื่อนปากมูล, RTGSKhuean Pak Mun, pronounced [kʰɯ̀a̯npàːkmūːn]) is a barrage dam and run-of-the-river hydroelectric plant 5.5 km west of the confluence of the Mun and Mekong Rivers in Khong Chiam District, Ubon Ratchathani Province, Thailand.[1] It was constructed by the Electricity Generating Authority of Thailand (EGAT) with support from the World Bank at a total cost of US$240 million, and completed in 1994.

YouTube Encyclopedic

  • 1/2
    Views:
    34 995 340
    1 683 707
  • The Man in the Iron Lung
  • 3 Signs of Jado (Jadu) | Sheikh Iqbal Salfi | Digital Dawah |

Transcription

Environmental impact

The project has been criticized for adverse effects on the fisheries of the Mun River, insufficient compensation payments to affected villagers, and failure to produce the projected power output. The immediate impact of the dam was to flood 117 km2 of land and displace families. The original plan estimated the displacement of 262 families. In the end, 912 families were displaced and 780 households lost all or part of their land.[2] In all, around 25,000 villagers claim to have been affected by the dam.[3] Protests have been staged at the dam site and outside Government House in Bangkok and critics have called for the dam to be immediately decommissioned.[4] As of 2000, EGAT had paid out 377.7 million baht in relocation compensation, plus 356.9 million baht for loss of fisheries with unsettled fisheries claims amounting to an additional 200 million baht.[5]: 20 

In response to concerns about the dam's likely impact on fisheries on the Mun River, a fish ladder was incorporated into the scheme to allow fish into the Mun River to spawn. The fish ladder has been "unsuccessful".[6]: 189  A report from the World Commission on Dams found that of 265 fish species previously found in the Mun River, at least 50 had disappeared and numbers of others had declined significantly. The fish catch decreased by 60–80%. It is uncertain what proportion of this decrease is attributable to the dam, and what proportion to other factors.[citation needed]

In response to protests, the government opened the dam gates temporarily in June 2001. Subsequently, a study by Ubon Ratchathani University recommended keeping the gates open for a further five years, and a study by Living River Siam recommended decommissioning the dam. Instead, the Thai Cabinet decided to close the gates for eight months each year from November 2002.[7]

As part of a two-year study to review the development effectiveness of large dams, the World Commission on Dams (WCD) commissioned the Thailand Development Research Institute (TDRI) to conduct a case study on the Pak Mun Dam. TDRI's report, published in 2000, concluded that "...EGAT over-stated the case of project benefits and did no justice to the method of benefit-cost analysis in exaggerating the value of net gains in power production and in claiming irrigation benefits on invalid grounds."[5]

References

  1. ^ "Pak Mun Dam". Electricity Generating Authority of Thailand (EGAT). Archived from the original on 7 January 2022. Retrieved 3 November 2019.
  2. ^ Kiguchi, Yuka (2016-02-22). "Pak Moon dam still a dilemma 25 years on". Bangkok Post. Retrieved 23 February 2016.
  3. ^ "Rivers of the World: the Mun River in Thailand" (Podcast). Radio Netherlands Archives. 31 January 2003. Retrieved 3 November 2019.
  4. ^ Setthachua, Chainarong (21 September 2019). "Dismantle the dams, reform water management in Northeast Thailand" (Opinion). The Isaan Record. Retrieved 3 November 2019.
  5. ^ a b "TDRI Report for The World Commission on Dams: Pak Mun Case Study" (PDF). Thailand Development Research Institute (TDRI). World Commission on Dams. 21 November 2000. Retrieved 3 November 2019.
  6. ^ Roberts, Tyson R (2001). "On The River of no Returns: Thailand's Pak Mun Dam and its Fish Ladder" (PDF). Nat. Hist. Bull. Siam Soc. (49). Thai Science: 189–230. Archived from the original (PDF) on 16 December 2013. Retrieved 16 December 2013.
  7. ^ International Rivers: Pak Mun Dam

Further reading

This page was last edited on 23 September 2023, at 04:03
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.