Svoboda | Graniru | BBC Russia | Golosameriki | Facebook

To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Urumi 1 Weir

Urumi 1 Weir is small diversion dam constructed across Poyilingalpuzha in Koodaranji village of Kozhikode district in Kerala, India.[1] This weir is constructed for power generation in a Small Hydro Electric Project and is constructed across the Poylingalpuzha which is a tributary of Chaliyar river. Location is at Urumi near Poovaranthodu, Koodaranji village of Kozhikode district.[2] Height from deepest foundation is 5.6 metres (18 ft) and the length is 47.0 metres (154.2 ft).

The Urumi falls near the dam has become a tourist attraction after the hydro electric project came into existence.[3]

YouTube Encyclopedic

  • 1/1
    Views:
    128 657
  • Secret Weapon of Indian Kings - Bagh Nakh aka Tiger Claws

Transcription

Specifications

Dam/Weir: Urumi I
Location Latitude:11⁰22’51.85”N Longitude:76⁰3’41”E Dam Features
Type of Dam Concrete gravity
Panchayath Koodaranji Classification Weir
Village Koodaranji Maximum Water Level (MWL) EL 212.1 m
District Kozhikode Full Reservoir Level ( FRL) EL 212.1 m
River Basin Chaliyar Storage at FRL Diversion only
River Poyilingalpuzha Height from deepest foundation 5.6m
Release from Dam to river Poyilingalpuzha Length 47.0 m
Taluk through which release flows Thamarassery Spillway Overflow section
Year of completion 2004 Crest Level EL 212.1 m
Name of Project Urumi stage I SHEP River Outlet 1 No. flushing sluice
Purpose of Project Hydro Power- Runn off Officers in charge & phone No. Executive Engineer, KG Division, Kakkayam, PIN-673615 Phone.9446008466
Installed capacity of the Project 3×1.25 ( 3.75 MW)

References

  1. ^ "Kerala State Electricity Board Limited - Small Hydro Projects". www.kseb.in. Retrieved 2021-07-29.
  2. ^ "Diversion Structures in Kozhikode District – KSEB Limited Dam Safety Organisation". Retrieved 2021-07-29. This article incorporates text available under the CC BY-SA 2.5 license.
  3. ^ ഷാബാസ്, സഫീര്‍. "കേരള വിനോദസഞ്ചാര ഭൂപടത്തില്‍ ഇടം നേടി ഉറുമി". Mathrubhumi. Retrieved 2021-07-29.

This page was last edited on 23 June 2024, at 15:45
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.