Master Plan Sample Clauses

Master Plan. The School shall prepare its own facility master plan in compliance with the rules of the Public School Capital Outlay Council and the Public Schools Capital Outlay Actxxvi.
AutoNDA by SimpleDocs
Master Plan. The Board and the Union agree that it is in the best interest of all stakeholders in the BCPSS that the parties to this Agreement work towards the realization of the goals set forth in the BCPSS Master Plan and its updates.
Master Plan. The building contractor undertakes to deliver a master plan to be approved by the contracting authority and its advisors within 15 calendar days following notification of contract conclusion. This plan must sufficiently anticipate situations to allow the contracting authority to take decisions or provide answers or supply the documents that are incumbent upon it. The master plan will be updated at least every month and must be consistent with the construction planning. It will be aligned with the construction planning and will be based on the same document. The contractor will be sole manager of the planning of all activities required to perform this contract. In particular he plans: - Set dates for delivering implementation plans that he needs, - The placing of orders to his suppliers and subcontractors, - The presentation in due time of samples and technical forms of products submitted for preliminary technical acceptance, - Measuring the works and the workshop manufacture period, - Indication of deadlines dates for decisions to be taken by the contracting authority, - Indication of deadline dates for the conclusion of modifications to orders being elaborated, - Indication of deadline dates for the achievement of works performed by other enterprises, - Registration, in due time, of the measurements of the works, - etc.
Master Plan. 5.12.1 The Concessionaire shall no later than 90 (ninety) days of the Appointed Date, prepare and submit, for review and comments from the Independent Engineer/ authorised representative of the Authority, a draft master plan ("Master Plan") for the Project. The Master Plan shall include, but not be limited to, the following:
Master Plan. 147 The building contractor undertakes to deliver a master plan to be approved by the contracting authority and its advisors within 15 calendar days following notification of contract conclusion. §148 This plan must sufficiently anticipate situations to allow the contracting authority to take decisions or provide answers or supply the documents that are incumbent upon it. §149 The master plan will be updated at least every month and must be consistent with the construction planning. It will be aligned with the construction planning and will be based on the same document. §150 The contractor will be sole manager of the planning of all activities required to perform this contract. §151 In particular he plans: • Set dates for delivering implementation plans that he needs, • The placing of orders to his suppliers and subcontractors, • The presentation in due time of samples and technical forms of products submitted for preliminary technical acceptance, • Measuring the works and the workshop manufacture period, • Indication of deadlines dates for decisions to be taken by the contracting authority, • Indication of deadline dates for the conclusion of modifications to orders being elaborated, • Indication of deadline dates for the achievement of works performed by other enterprises, • Registration, in due time, of the measurements of the works, • etc.
Master Plan. The Authority must adopt a Master Plan that describes, among other things, the operations of the Authority in sufficient detail to fund and implement the System and any related facilities or programs and to allow the Authority to plan for financing, investments, and improvements related to the System.
Master Plan. The master plan of the City, originally presented in 1984, as may be amended, modified or supplemented by the City, in conjunction with the Comprehensive Plan.
AutoNDA by SimpleDocs
Master Plan. (1) The master plan shall be as shown in the Authority’s Drawings. The master plan has been developed by the Authority to meet operational and technical criteria. The Contractor is not required to evaluate the master plan for compliance with these criteria, but shall review, verify and validate it with respect to his own design and construction proposals and shall also satisfy himself that there is no conflict with any existing structures (both underground and above ground) which are to be preserved. However, as a result of Contractor’s detailed topographic survey, verification, staking and setting out of the master plan at site, if any error/ mismatch /conflict etc. is detected in Authority’s Drawings, the Contractor shall undertake the required modifications in the Master Plan in agreement with the Engineer and as stipulated in the sub-clauses below without any additional cost or implications to the Authority.
Master Plan. A copy of the proposed master plan detailing the proposed development for the Property (“Master Plan”) is attached hereto and made a part hereof as Exhibit “D”.
Master Plan. Concessionaire agrees that no liability shall attach to the City, its officers, agents and employees by reason of any efforts or action toward implementation of any present or future master layout plan for the Airport, and waives any right to claim damages or other consideration arising therefrom.