Version 1
: Received: 4 July 2023 / Approved: 4 July 2023 / Online: 4 July 2023 (11:22:13 CEST)
How to cite:
Saborit, E.; García-Rosales, E.; Gracia, M. D. S. D.; Nieto, G. M. R.; Fondón, P. M.; Abánades, A. Alternatives for Transport, Storage in Port and Bunkering Systems for Off-Shore Green Hydrogen. Preprints2023, 2023070216. https://doi.org/10.20944/preprints202307.0216.v1
Saborit, E.; García-Rosales, E.; Gracia, M. D. S. D.; Nieto, G. M. R.; Fondón, P. M.; Abánades, A. Alternatives for Transport, Storage in Port and Bunkering Systems for Off-Shore Green Hydrogen. Preprints 2023, 2023070216. https://doi.org/10.20944/preprints202307.0216.v1
Saborit, E.; García-Rosales, E.; Gracia, M. D. S. D.; Nieto, G. M. R.; Fondón, P. M.; Abánades, A. Alternatives for Transport, Storage in Port and Bunkering Systems for Off-Shore Green Hydrogen. Preprints2023, 2023070216. https://doi.org/10.20944/preprints202307.0216.v1
APA Style
Saborit, E., García-Rosales, E., Gracia, M. D. S. D., Nieto, G. M. R., Fondón, P. M., & Abánades, A. (2023). Alternatives for Transport, Storage in Port and Bunkering Systems for Off-Shore Green Hydrogen. Preprints. https://doi.org/10.20944/preprints202307.0216.v1
Chicago/Turabian Style
Saborit, E., Pablo Martínez Fondón and Alberto Abánades. 2023 "Alternatives for Transport, Storage in Port and Bunkering Systems for Off-Shore Green Hydrogen" Preprints. https://doi.org/10.20944/preprints202307.0216.v1
Abstract
Offshore electricity production, mainly by wind turbines, and eventually floating PV in the future, will contribute to increase renewable energy production, as well as their dispatchability. The need for that energy evacuation and the implementation of the hydrogen economy are challenges that arise the evaluation of such energy facilities for the direct production of hydrogen. The analysis of the alternatives for the evacuation of offshore renewable electricity for the production of hydrogen is presented. The analysis includes discussion about the current state of the art of hydrogen pipelines and subsea cables, as well as the storage and bunkering system that is needed on shore. The main options for energy evacuation will be via an electric subsea cable to produce hydrogen onshore, or by pipeline, depending on the capacity of the offshore plant. For low capacity, an electric subsea cable is the best option. For high capacity renewable offshore plants, pipelines start to be competitive for distances above aprox. 450 miles.
Copyright:
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.